Made from stone!
• Reuse of waste minerals vs. using virgin trees
• Manufacturing requires far less energy, resulting in
much lower CO2 emissions
• Manufacturing process does not pollute waterways
with toxic effluent like traditional pulp mills
Production Time: 30-35 days
Transit Time: 75 days
2500 | 5000 | 10000 |
---|---|---|
$5.10 | $3.61 | $2.97 |